My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 2 of 18 <br />Gaftl2r ErlgfoE!E!r1~9 B. The CONSTRUCTION MANAGER will perform a preliminary <br />review of the shop drawing submittals and confirm that they comply <br />with the overall format requirements of SECTION O l 340 of the <br />CONTRACT SPECIFICATIONS and that a suftlcient quantity of <br />submittal copies has been supplied. The CONSTRUCTION <br />MANAGER will only pass a shop drawing submittal on to Garber <br />Engineering if it meets these requirements. <br />C. The CONSTRUCTION MANAGER will give Garber Engineering <br />at least two (2) copies of any shop drawing submittal if Garber <br />Engineering does not need to have one of its subconsultants <br />(electrical or structural) review the shop drawing submittal and at <br />least three (3) copies if one of Garber Engineering's subconsultants <br />(electrical or structural) must review the shop drawing submittal. <br />Garber Engineering will return at least one copy. <br />D. The CONSTRUCTION MANAGER will forward to Garber <br />Engineering all comments by other reviewers (not including Garber <br />Engineering's subconsultants) and will inform Garber Engineering <br />when no more comments from others are expected. <br />E. The CONSTRUCTION MANAGER will distribute the submittals, <br />follow up with parties besides Garber Engineering who are to <br />review the shop drawing submittals and forward the comments by <br />others to Garber Engineering in a timely manner. Garber <br />Engineering will not be responsible for delays caused by others (not <br />including Garber Engineering's subconsultants). <br />F. The shop drawing submittals themselves will be in accordance with <br />SECTION 01340 of the CONTRACT SPECIFICATIONS. <br />G. The number of shop drawing submittals addressing new topics will <br />be no more than the number of shop drawing submittal topics listed <br />in PARAGRAPH 01340 1.10 D ofthe CONTRACT <br />SPECIFICATIONS. <br />H. The total number of shop drawing submittal events reaching Garber <br />Engineering (including resubmittals) will not exceed the number of <br />discrete submittal topics actually submitted times two (2). In other <br />words, the grand total number of resubmittals will not exceed the <br />C\DOCwnems and Smmgs\MauheH Garbw~Nc Oucwnevts\PROI\COPU@\COPa@.PUU'_wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.