Laserfiche WebLink
EXHIBIT A <br />sar~~r E~gi~~erl~g <br />March 9, 2007 <br />Mr. Steve Cusenza <br />City of Pleasanton <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566 <br />Fax: (925)931-5595 <br />Subject: Vineyard Avenue Corridor Water Booster Pump Station and Zone 7 <br />Turnout #6 -Proposal for Construction Phase Services <br />Dear Steve: <br />Thank you for the opportunity to update the proposal on the construction phase <br />engineering services for the Vineyard Avenue Water Booster Pump Station and the <br />Alameda County Flood Control and Water Conservation District Zone 7 (Zone 7) <br />Pleasanton Turnout Number 6 (Turnout #6). Please review this proposal and <br />contact me with any questions, comments or suggestions you may have. <br />This proposal includes services for Civil and Mechanical engineering, provided by <br />Garber Engineering, Electrical engineering, provided by ECS Engineering, Inc., <br />and Structural Engineering, provided by TJC & Associates, Inc. It does not include <br />geotechnical services, building architectural services, landscape architecture <br />services or other services clearly outside the included fields listed above. <br />Job Number: COP002 <br />SCOPE OF WORK <br />WATER BOOSTER PUMP STATION <br />OVERALL ASSUMPTIONS <br />The time from the CONTRACTOR'S notice to proceed to the final <br />acceptance of the project will not exceed 1 year. <br />2. The City of Pleasanton will have a CONSTRUCTION MANAGER for this <br />WORK. <br />SUBMITTALS <br />Assumptions: <br />A. The CONSTRUCTION MANAGER will receive, log, and distribute <br />shop drawing submittals made by the CONTRACTOR. <br />C~Documems and SatitlgsNdatthea GarberVN~ Uocwnena~PR011COPnuPCOPnU2 Puna wpd <br />