~~ <br />t~l~r~1 f{i~~. 1°~{_ll I'~ <br />The following schematic illustrates Tetra Tech's three-phased approach to providing the requisite <br />construction services. This chart graphically depicts all of the integrated services that we will provide <br />throughout the duration of construction. By having Tetra Tech serve the City as a single source of <br />responsibility, the construction management activities will be well coordinated and proceed expeditiously. <br />The successful delivery of these services will require us to focus on several key issues, as briefly outlined <br />below. <br />Communication <br />' Our Construction Manager and staff will serve as agents and team members of <br />the City by maintaining regular communication with the City's representative, <br />surrounding community, and construction contractor. As indicated previously, <br />Bijan Daneshmand, as Construction Manager, will be the single point of <br />contact for all elements of project status. He will conduct regularly scheduled <br />project meetings, maintain project documentation files, submittal logs,l3FI <br />logs, and coordinate field inspection and office engineering staff. Mr. <br />Daneshmand will be able to quickly and accurately up-date City statfon <br />~ project status and issues at any time during the project. <br />Construction Procedures Manual <br />One of the keys to Tetra Tech's success on similar projects is the preparation of a Construction Procedures <br />Manual for all construction management assignments. The manual describes management and <br />administration procedures, such as lines of communication, submittals, project forms to be used, <br />inspection and testing requirements, permits, etc. The manual also desen'bes how all parties will interact <br />on the project and provides the contractor with a guideline to follow to simplify submittal and coordination <br />efforts. <br />Responsiveness to Contractor <br />Key to avoiding unnecessary contractor claims and schedule delays is our timely response to contractor <br />inquiries and execution of the submittal process. Our Construction Manager will be a direct link between <br />the contractor, City, and design engineer. Continuous, open communication and strict adherence to the <br />Construction Procedures Manual will help to avoid disputes and schedule delays. <br />Our Construction Manager will work diligently to complete the assigned project without any unresolved <br />claims. Contractor issues and disputes will be addressed and resolved as they occur. <br />schedule f~ontroi antl Tracking <br />More than simply reviewing contractor schedules, we will work with the contractor to keep ahead of the <br />issues that may tend to delay the project. Potential delays may include obtaining permits, interfacing with <br />the City and local conununity, soil and materials testing, preparing operation and maintenance manuals, <br />meeting start-up and testing requirements, and completing final punch list items and record drawings. Our <br />experience has taught us that final testing and closeout items often can delay project completion. A <br />number of items can be utilized to help avoid delays, such as: <br />TETRA T[CH tNC <br />l It)~ ~. ~t (~~Y,4 S;i ~l ~')li ~ nll Ultit ~itill P`t I(1.1~~ ~lil ~`fIY Cr~i'/Itt]; <br />