Laserfiche WebLink
ATTACHMENT 5 <br />PEDESTRIAN PATH ON THE ARROYO MOCHO BETWEEN STONERIDGE DR AND SANTA RITA RD <br />ITEM <br />UNIT <br />ESTIM. <br />QUANTITY <br />UNIT <br />Price <br />ITEM <br />TOTAL, $ <br />I <br />Traffic control system <br />LS <br />I <br />$5,000.00 <br />$5,000.00 <br />2 <br />Clearing and grubbing <br />LS <br />1 <br />$20,000 00 <br />$20,000 00 <br />3 <br />Bike Path excavation / export and grading <br />LS <br />I <br />$30,000.00 <br />$30,000 00 <br />3 <br />Erosion and sedimentation control <br />LS <br />1 <br />$1,000.00 <br />$1,000 00 <br />5 <br />Asphalt Concrete Type B <br />TON <br />30 <br />$150 00 <br />$4,500 00 <br />6 <br />Aggregate Base <br />TON <br />60 <br />$50 00 <br />$3,000.00 <br />7 <br />Retaining Wall with Hand Rail (15' Tall to I) <br />LF <br />350 <br />$125 00 <br />$43,750.00 <br />8 <br />Storm Drain (utfall Structure <br />LS <br />I <br />$10,000.00 <br />$10,000 00 <br />9 <br />Access Gates <br />EA <br />2 <br />$2,500 00 <br />$5,000.00 <br />1) <br />It) fond wide Fnsemr.nt <br />SF <br />;c00 <br />$15 00 <br />$52,500 00 <br />I 1 <br />FTWineerin^ Design Fees <br />1 C <br />1 <br />525 000 00 <br />525,000 00 <br />Total Estimated Cost <br />$199,750.00 <br />