My WebLink
|
Help
|
About
|
Sign Out
12 Exhibits
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
022007
>
12 Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 3:42:28 PM
Creation date
2/15/2007 3:32:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
12 Exhibits
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e. Implement the building design changes specified by Larry Cannon for <br />Home Depot, dated July 12, 2006, and for the Gateway Center, dated <br />November 7, 2006. <br /> <br />These changes shall be shown on the building permit plan set, subject to the <br />review and approval by the Planning Director, before issuance of a building <br />permit. <br /> <br />14. The development covered by this approval shall implement the City's Green <br />Building Ordinance as follows: <br /> <br />a. The project developer shall implement the measures identified in the U.S. <br />Green Building Council's (USGBC), "Leadership in Energy and <br />Environmental Design (LEED)" 2.0 rating system in the design, <br />construction, and operation of the proposed Home Depot building supply <br />store and garden center to achieve a "Certified" level. <br /> <br />b. The project developer shall use their best efforts to implement the <br />measures identified in the U.S. Green Building Council's (USGBC), <br />"Leadership in Energy and Environmental Design (LEED)" 2.0 rating <br />system in the design, construction, and operation of the Longs Drugs <br />pharmacy building and the Stores "A", "B", and "C" buildings and the "Pad" <br />building, including all future tenant improvements. These measures shall <br />be shown on the building permit plan set submitted for review and <br />approval before issuance of a building permit. <br /> <br />15. No signage is approved with this application. A comprehensive sign program <br />shall be submitted to the Planning Director for review and approval under a <br />separate sign design review application prior to submittal of the first building <br />permit application. <br /> <br />16. Longs Drugs operating hours are 6:00 a.m. to 10:00 p.m., except for the drive- <br />through, which may operate 24 hours per day. Truck delivery and loading/off- <br />loading hours are from 6:00 a.m. to 10:00 p.m. <br /> <br />17. No grill, cook top, range, grill faceplate, etc., of any type may be located in any <br />restaurant, soda fountain, coffee shop, etc., located in the "Pad" building. This <br />condition shall be verified by the Planning Director with the tenant improvement <br />application(s) for this building. <br /> <br />18. Any tenant that locates within the complex shall be required to keep any doors <br />facing Stanley Boulevard and/or Bernal Avenue closed at all times. <br /> <br />19. All restaurant facilities shall be equipped at all times with odor-control and <br />filtering devices to minimize odors and fumes at the source. The devices shall be <br />shown on the tenant improvement plans to the satisfaction of the Chief Building <br /> <br />Page 6 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.