My WebLink
|
Help
|
About
|
Sign Out
20A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
20A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:15:40 PM
Creation date
2/1/2007 4:10:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
20A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />PRELIMINARY ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS- <br />VINEYARDAVENUE CORRIDOR SPECIFIC PLAN AREA <br />WATER S'~ORAGE TANK <br />City of Pleasanton, Calrfomia <br />(Access Road Improvements on Remick Property - Up to Existing Residence) <br />(Incremental costs beyond the 12-foot wide Tank Access Road for 18-foot wide Private Street) <br />ITEM DESCRIPTION <br />Roadw` aylt=ms <br />1 . Clear & Grub <br />2 . Rough Grading <br />3. Import <br />4 . Fine Grading <br />5 , Asphalt Paving (3" AClB" AB) <br />8 . 2' Retaining Wall <br />7 . 3' Retaining Wall <br />g , 4' Retaining Wail <br />g . 8" Sanitary Sewer <br />10 . Sanitary Sewer Manholes <br />11 . Additional roadway design costs <br />12 . Survey staking <br />13 . Geotechnical construction support <br />AMOUNT <br />$2,000 <br />$5,000 <br />$8,000 <br />$2,200 <br />$36,000 <br />$4,000 <br />$15,000 <br />$15,000 <br />$39,000 <br />$39,000 <br />$11,000 <br />$5,000- <br />$5,000 <br />Subtotal Roadway Costs <br />JoirR T~ nch items <br />14 . gddiitonal trenching cost $4,500 <br />000 <br />$9 <br />15 . Additional vaults and splice boxes ' <br /> (Boxes equipped with J-bars to splice <br /> primary and secondary service runs) <br /> <br />16 . <br />Additional conduits (telephone, cable $18,750 <br /> and secondary electrical) ~ 800 <br />17 . PG8E Gas system $25 <br />000 <br />18 . Additional PG&E Contract costs , <br />$5 <br />750 <br />19 Additional Joint Trench DesigMnspection co , <br />. Subtotal Joint Trench Costs <br />$184,200 <br />$69,800 <br />15% Construction Contingency (construction items only) 3$ 0.000 <br />Total Estimated Construction Cost $284,000 <br />Note: Utilities will be stubbed to future lots only. No service laterals will be constructed within future lots. <br />
The URL can be used to link to this page
Your browser does not support the video tag.