My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2007 4:17:16 PM
Creation date
2/1/2007 3:59:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scog e of Work <br />The attached consultant contract with HDR Engineering, Inc. includes two phases of <br />work to complete the comprehensive local sewer rate study. The first phase is an <br />evaluation of the City's existing rate structure and policies. <br />The Phase Two work effort includes a technical analysis of work developed in Phase <br />One along with the review of the existing City sewer fund policies in order to design the <br />new local sewer rates for consideration of staff and eventual final adoption by Council. <br />A comprehensive rate study of this complexity normally would require between 16 and <br />32 weeks to complete, dependent upon City review time, time to collect and provide <br />data, meeting scheduling, etc. If the City Council approves the consultant contract, the <br />consultant and City staff have determined that the work should be completed by August <br />1, 2007. <br />Submitted by: <br />Fiscal Review: <br />Approved b <br />Nelson Fialho <br />City Manager <br />Rob Wilson David P. Culver <br />Director of Public Works Director of Finance <br />Attachments: <br />1. Contract for Consulting Services <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.