Laserfiche WebLink
Exhibit B -Project Fees <br />Project Fees <br />HDR Hourly Billing Rates <br />For the City's comprehensive local sewer rate study, HDR Engineering, Inc. (HDR) will utilize <br />the following hourly billing rates. <br />Tom Gould Project Manager $225.00/hour <br />Shawn Koorn Manager-Technical Analysis $135.00/hour <br />Tim Monahan Manager-Engineering Analysis $165.00/hour <br />Cil Pierce Technical Analysis $135.00/hour <br />Dina O'Reilly Technical Analysis $95.00/hour <br />Kevin Lorentzen Technical Analysis $90.00/hour <br />Various Project Assistant $85.00/hour <br />Should other individuals be required, they will be billed at their standard hourly billing rates. All <br />additional and approved work (outside the scope of services) shall be billed using the above <br />hourly billing rates. <br />Project Fees <br />Based upon the current hourly billing rates and the estimated labor needed to conduct the local <br />sewer rate study, HDR has developed the following fees for City's project. <br />L ~ Comprehensive Local Sewer Rate Study B-~ <br />jJ City of Pleasanton <br />