My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2007 4:17:16 PM
Creation date
2/1/2007 3:59:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A -Scope of Work <br />^ Review of the proposed implementation strategies <br />Deliverables as a Result of Task 2.2 -Implementation Strategies. From the work accomplished <br />above, the deliverables for this task will be as follows: <br />^ Development of an implementation strategy for the smooth transition to the proposed rates <br />Task 2.3-Working Session With the City Council <br />Task Objective: Provide effective public presentations of the findings, results and <br />recommendations of the study. <br />The overall quality and value of a rate study is often measured by the quality of the public <br />presentation process. In addition, the ability of the consultant to present this technical material in <br />a manner that is easily understandable to a City Council and the public is paramount. HDR <br />excels in this aspect of the study. <br />The City has requested one public meeting or working session with the City Council to discuss <br />the findings, conclusions and recommendations of this study. For this meeting, HDR will <br />develop all handout materials. HDR will work with the City to determine the content, timing and <br />schedule for the meeting. Should additional public meetings/presentations be required, they will <br />be provided on a time and material basis. <br />Expected City Staff Support for Task 2.3: For this task, the City will be expected to: <br />^ Review and comment on any proposed handouts for the working session (public meeting) <br />Deliverables as a Result of Task 2.3 -Working Session With City Council. From the work <br />accomplished above, the deliverables for this task will be as follows: <br />^ Provide a working session with the City Council to discuss the findings, conclusions and <br />recommendations of the study. <br />Task 2.4-Provide Rate Model <br />Task Objective: Develop a rate model specifically for the City and provide a copy of all rate <br />models developed as a part of this study. <br />The financial/rate model developed for the City will be provided to the City at the end of the <br />study. The model will be developed using the spreadsheet program of the City's choice (e.g. <br />Excel, etc.). The model developed as a part of this study is developed specifically for the City <br />(i.e. built from the ground up). As the model is developed, HDR will work closely with City <br />staff to attempt to provide a model that is easy to use and understand. <br />Within the City's RFP, the City has specified that the model, at a minimum, contain or have the <br />capability to: <br />- Cover a 10-year planning period <br />- Reflect the City budget format and accounts <br />- Use summary tables that will match those shown in the final study report <br />- Provide side-by-side comparisons of rate adjustment tables and graphs of reserve fund <br />balances <br />^` Comprehensive Loeal Sewer Rate Study A-12 <br />~. \ City of Pleasanton <br />
The URL can be used to link to this page
Your browser does not support the video tag.