Laserfiche WebLink
<br />These changes resulted in an additional project cost of $59,018.06, which was within the <br />20% ($70,000) contingency for this project. Staff recommends that the balance of project <br />funds be transferred into the Annual Water Replacement Project (CIP NO. 061000). <br /> <br />FISCAL IMPACT <br /> <br />This project will provide adequate transmission capacity to zone "770" and improve <br />performance of the Longview Pump Station. This project will add infrastructure to the <br />City's existing water supply system that will result in minimal additional annual operating <br />costs. <br /> <br />Respectfully submitted, <br /> <br />--ra -OJ- <br /> <br />lli~~~ <br /> <br />David P. Culver <br />Director of Finance <br /> <br />w <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />Nelson Fialho <br />City Manager <br /> <br />Attachment: Location Map <br /> <br />Page 3 of3 <br />