My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2007 3:30:19 PM
Creation date
1/11/2007 1:36:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />These changes resulted in an additional project cost of $59,018.06, which was within the <br />20% ($70,000) contingency for this project. Staff recommends that the balance of project <br />funds be transferred into the Annual Water Replacement Project (CIP NO. 061000). <br /> <br />FISCAL IMPACT <br /> <br />This project will provide adequate transmission capacity to zone "770" and improve <br />performance of the Longview Pump Station. This project will add infrastructure to the <br />City's existing water supply system that will result in minimal additional annual operating <br />costs. <br /> <br />Respectfully submitted, <br /> <br />--ra -OJ- <br /> <br />lli~~~ <br /> <br />David P. Culver <br />Director of Finance <br /> <br />w <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />Nelson Fialho <br />City Manager <br /> <br />Attachment: Location Map <br /> <br />Page 3 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.