Laserfiche WebLink
<br />PROPOSED PROIECT SCHEDULE OUTLINE: <br /> <br />Project Step: <br />Month I: I 2 3 4 Month Two: 5 6 7 8 MonthThree: 9 10 II 12 13 Month4: 14 IS <br /> <br />Initial Meetings: _ <br /> <br />CAPlUser Fee Interviews: <br /> <br />I" Draft of Reports: <br /> <br />Comments/Changes: <br /> <br />Final Reports Delivered/Meetings: <br /> <br />Final SOJdy Reports Completed: <br /> <br />User Fee Models Installed: <br /> <br />II <br /> <br />The schedule above is representative of a summary of the steps required to complete the user fee sOJdy. The <br />schedule allows for a limited number of draft reports. The number of draft iterations is limited by the desired <br />schedule. If the city desires additional chances for review, the schedule can be adjusted to reflect the City's final goals <br />and objectives. <br /> <br />Public Resource Management Group. LLC <br /> <br />PRM <br /> <br />City of Pleasanlon Proposal 23 <br />