My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2007 3:30:35 PM
Creation date
1/11/2007 1:04:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.~ <br />II- <br />Skf <br /> <br /> <br />EXHIBIT "A" <br /> <br />SECTION 1 BKF's approach and interpretation to tasks outlined in the Scope of Work <br /> <br />Scope of Work lIS Outlined in Section B: <br /> <br />Task 1: Kick-off Meetin!! - RFP states: <br /> <br />Meet with City Staff during initial phase of study to clarify the study alternative design objectives, collect <br />data, collect operations and engineering input, needs, desires and current operating challenges with the <br />existing pump station, and input regarding needs and desires of the final pump station reconstruction <br />design. The meeting will also be used to establish regular communication lines between BKF and the <br />City. <br /> <br />j <br /> <br />Our assigned Project Manager, Michal'! Liu, has visill'd the pUlllp station .sitt' and Illl't with the City's <br />Project Manager and operation dl'p1ll1lllent staff to understand tilt' rt'4uirelllt'nts of this proiec'!. HKI. <br />ohtained a few sections of the Mastel' Plan, dated M'!rch ~()lli). that are relt'\il/lt to pump station S-I> 1'0. <br />the preparation of this proposal. \\-'e have revieweu (he avallahle information and familiarized llUP'il'hcs <br />with the document and are ahle to comlllunicate with City Staff during the initial phast' of study. In this <br />initialnlt'eting, we would like to achieve the following goals: <br /> <br />j <br /> <br />. Funher understand the City's desires of the project <br />. Clarify the objectives of existing pump station evaluation and nt'W pLllllp station alternatilt' <br />stLldy <br />. Collecl data. ontain operalions and engineering input. galher rch.'\anl drawing.'l and any <br />a\'ailahle information <br />· lInderstand the operating challenges of the existing pUlllp station <br />· Input regarding the needs and desire,s of the final pump station rec'onstnlt.tion design <br /> <br />! <br />I <br /> <br />Our lI\'.\igl1ed Pro;t'('! /v!lIIll1gef" Iv/icho!'! Lilt will hi' thi' ('OIlI(/c(/"1" tht' ('ngill('('ring s('n';n' of/his 1)I'oil'''' <br /> <br />Contact information; <br /> <br />Michael Uu, Senior ProjL'Ct Mana~cr <br />255 Shoreline Drive, Suite 200 <br />Redwood City, CA 94065 <br /> <br />Pholle: (65IJ) 482-6353 (diret'l) <br />Fax: (65IJ) 482-6399 <br />Emui/: 1Il1i1l(iN'Vmll/ <br /> <br />Task 2: Existin!! Pump Station Review: _ RFP states: <br /> <br />2.1 Thorough research of all past S-6 pump station engineering design repons, drawings, maps, existing <br />property boundaries, etc. If currelll propenies appear to be a constraint, review adjacent propenies <br />for possible new pump station locations. Collect any other required information and data to initiate <br />pre-de sign. <br />
The URL can be used to link to this page
Your browser does not support the video tag.