My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2007 3:30:35 PM
Creation date
1/11/2007 1:04:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />SUBJECT: <br /> <br />13 <br /> <br />.J <br /> <br />City Council <br />Staff Report <br /> <br />January 16, 2007 <br />Public Works Department <br /> <br />APPROVAL OF CONSULTANT AGREEMENT WITH BKF TO <br />PROVIDE ENGINEERING SERVICES FOR SANITARY SEWER <br />PUMP STATION S-6 EVALUATION AND PRE-DESIGN, <br />PROJECT NO. 012027 <br /> <br />STAFF RECOMMENDATION: <br /> <br />SUMMARY: <br /> <br />Page I of3 <br /> <br />Staff recommends that the City Council take the following action at the <br />meeting of January 16,2007: <br /> <br />1. Approve the contract with BKF to provide necessary engineering <br />services in the amount of $79,879 for the subject project. <br /> <br />2. Authorize the City Manager to execute the attached subject contract. <br /> <br />Staff is requesting authorization for the City Manager to execute a <br />contract with BKF to provide an operational assessment of the existing S- <br />6 wastewater pumping station (relative to keeping it in operation for the <br />next 2-3 years), along with preliminary design services for a replacement <br />pump station. Sanitary Sewer Pump Station S-6 is in poor condition with <br />capacity problems and in need of immediate replacement. Due to the <br />nature of this type of facility, a consulting fIrm is necessary to perform <br />the specialized renovation analysis and design work required. BKF was <br />selected as the most qualifIed fIrm to perform this work, after an <br />evaluation of project proposals from three fIrms. BKF has agreed to <br />perform this work for a not-to-exceed amount of $79,879. This project is <br />funded by Sewer Improvement funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.