Laserfiche WebLink
7. That the material and color of the roof equipment screen <br />shall match the building wall. This shall be noted on the <br />final building plans, which shall be subject to review and <br />approval by the Planning Director prior to. the issuance of <br />building permits for the development. <br />8. That the applicant shall specify the types, sizes, and <br />location of all trees, shrubs, and groundcover used on the <br />site. Trees shall include both 24-inch box and 15-gallon <br />size containers, and shrubs shall be a minimum of 5 gallons <br />in size. These details shall be shown on the final landscape <br />plan and shall be subject to review and approval by the <br />Planning Director prior to the issuance of building permits <br />for the project. <br />9. That the applicant .shall provide larger, more densely planted <br />landscape materials along the east property line to screen <br />visibility of the loading/service area. This landscaping <br />shall be shown on the final landscape plans submitted for <br />issuance of building permits and shall be subject to the <br />approval of the Planning Director. <br />10. That the signage program proposed shall be modified to allow <br />wall signs only on the north and west elevations of the 2- <br />story building and to require building addresses on and <br />illumination of the entry monument signs. All signs shall be <br />subject to review and approval by the Planning Director prior <br />to installation. <br />11. That the landscaping around the trash/transformer enclosure <br />at the northwest portion of the site shall conform <br />substantially to the detailed site plan dated August 11, <br />1989, except that the landscaping shall be bermed directly u~ <br />against the wall of the enclosure in order to more <br />effectively screen it from the street. This shall be shown <br />on the final plans submitted for issuance of building permits <br />and shall be subject to review and approval by the Planning <br />Director. <br />12. That this development is subject to all of the "Standard <br />Conditions of Development", except for Conditions No. 12, 14, <br />29, 33, 46, 49, and 50. <br />pc8978/sm <br />-4- <br />