Laserfiche WebLink
- no right-of-way is required except at project <br />The developer shall acquire any necessary right-of-way along <br />Stanley Boulevard for the interim street alignment. If the <br />developer is unable to acquire said right-of-way, the City may <br />use its power of eminent domain. The developer shall <br />reimburse the City for all right-of-way costs incurred in the <br />acquisition. <br />45. The approaches to the driveway aprons shall be modified to <br />include a 12' wide flared opening to the public street, a <br />paved approach at the driveway entrance, a 6" concrete curb <br />along the zero lot line side of the adjacent structure, and a <br />reduced size tree well. These changes shall be shown on the <br />tenatative map. <br />46. Prior to submittal of the tentative map, the developer shall <br />work with staff to explore the possible means to avoid <br />relocating the major storm drain and sanitary sewer lines on <br />the site. Any modifications required to maintain these <br />utilities in their present locations shall be shown on the <br />tentative map to be reviewed by the Planning Commission. <br />(pud9014.srp)mp <br />28 <br />