My WebLink
|
Help
|
About
|
Sign Out
SR 06:281
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2006 4:46:28 PM
Creation date
12/13/2006 4:46:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:281
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />On May 2, 2006, the City Council awarded the construction contract for the subject project to <br />the lowest responsible bidder, Rosas Brother Construction, in the amount of $177,976.00. The <br />subject project has since been completed and is now ready for acceptance. <br /> <br />The General Fund provided funding for the Annual Curb and Gutter Replacement project, CIP <br />No. 055009, for fiscal year 2005/2006. Approximately 590 linear feet of damaged curb and <br />gutter along with 9,856 square feet of damaged sidewalk and driveway was replaced on <br />Blackbird Way, Kolln Street, Jensen Street, School Street, Graham Street, Cotterell Court, <br />Vineyard Avenue (between Bernal Avenue and Grapevine Drive), West Las Positas Boulevard <br />(between Hopyard Road and Hacienda Drive), and Valley Avenue (between Hopyard Road <br />and Santa Rita Road). Twenty-four (24) access ramps were also installed as part of this <br />project. <br /> <br />BUDGET <br /> <br />The fmal project funding and expenditures are presented below. <br /> <br />Funding: <br />CIP No. 055009 <br />Annual Street Resurfacing, CIP No. 055003 <br />TOTAL: <br /> <br />$150,000.00 <br />$64,000.00 <br />$214,000.00 <br /> <br />Expenditures: <br />Construction Contract <br />Change Orders <br />Miscellaneous (supplies) <br /> <br />TOTAL: <br /> <br />$177 ,976.00 <br />$32,208.00 <br />$83.00 <br />$210,267.00 <br /> <br />A significant amount of the contract change orders ($29,351.24) was a result of an increase in <br />the contract quantities, resulting from expanding the project work into areas not originally <br />identified on the project plans. An additional 590 linear feet of curb/gutter and 1,632 square <br />feet of sidewalk/driveway were needed for replacement because as old concrete was removed, <br />additional cracking occurred in adjacent panels that were then also removed and replaced. <br /> <br />Staff recommends that unexpended funds in the amount of $3,733 be transferred to the Annual <br />Resurfacing account for Project No. 065003, for future annual street resurfacing projects. <br /> <br />SR 06:281 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.