My WebLink
|
Help
|
About
|
Sign Out
SR 06:267
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2006 4:32:19 PM
Creation date
12/13/2006 12:56:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:267
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />On June 20, 2006, the City Council awarded the construction contract to Granite <br />Construction Company, Inc. of Santa Clara, in the amount of $544,660 with a $54,466 <br />(10 %) contingency. The project consisted of removing reinforced concrete circles and <br />approach islands (roundabouts) and included widening the roadway along the north edge of <br />Vineyard Avenue by approximately 18 feet between the Thiessen Street (East and West) <br />loop. The approximate length of roadway improvements is 1,900 feet. The final roadway <br />width generally consists of two 6-foot bike lanes, two 12-foot travel lanes, and a 12-14 foot <br />left turn pocket/acceleration lane. In this reconstructed area, the roadway width and <br />transitions taper to accommodate vehicles turning onto Vineyard Avenue from the side <br />streets. Conventional tee intersections were constructed at Thiessen Street (East and <br />West). <br /> <br />The construction improvements maintain the southerly edge of roadway pavement and <br />increased the roadway width to the north, retaining a 16-foot buffer between the north edge <br />of pavement and the Lonestar property fence line to accommodate a pedestrian trail and <br />landscaping along the fence line. Underground conduits were installed at the intersection <br />of Vineyard Avenue and Thiessen Street (West and East) to accommodate a future traffic <br />signal(s) if necessary, to accommodate future development in the area. <br /> <br />BUDGETED FUNDS <br /> <br />Vineyard Avenue Roundabout Removal, CIP No. 055033 <br />(from Annual Resurfacing Projects) <br /> <br />$662,702.00 <br /> <br />EXPENDITURES <br /> <br />Original Construction Contract <br />Net Construction Change Orders (12) <br />Engineering <br />Surveying Services <br />Geotechnical Services <br />Miscellaneous Expenses (Advertisement for bids, reproduction of plans and <br />specifications) <br />Total Expenditures <br /> <br />$544,660.00 <br />$143,925.05 <br />$63,576.00 <br />$13,680.00 <br />$4,272.45 <br />$675.34 <br /> <br />$770,788.84 <br /> <br />SR 06:267 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.