Laserfiche WebLink
<br />development plan shall include all required information to design and construct site, <br />grading, paving, drainage, and utilities. Specific items to be indicated on the site <br />development plan necessary to construct the improvements are to be in accordance <br />with the City of Pleasanton Private Development Design Guidelines adopted <br />April 15, 1986. <br /> <br />56.AII retaining walls higher than four-feet from the top of the wall to the bottom of the <br />footway shall be constructed of reinforced concrete or shall be an approved crib wall <br />type. Calculations signed by a registered civil engineer shall accompany the wall <br />plans. <br /> <br />57. The project developer shall submit plot plans for each of the residential lots showing <br />building setbacks and a topographic plan showing grading and drainage. Pad <br />elevations, finish floor elevations, retaining walls, easements, and maximum height <br />of the highest structure are to be indicated on the plan. Plans for custom lots are to <br />be signed by a registered civil engineer. All residential plot plans shall show <br />compliance with 2907(d) and 70012(d) of the Uniform Building Code. <br /> <br />58. Unless otherwise required and/or permitted, the project developer shall submit two <br />copies of the site soils report to the Chief Building Official for third-party peer review <br />and shall pay for such review at the time specified by the Chief Building Official, but <br />in all cases before the issuance of a grading permit. <br /> <br />59. The project developer shall submit record tract grading plans showing: <br /> <br />a. The elevation of all four corners of the lot as well as the center of the lot; <br />b. all top and toe of slope elevations; and <br />c. the top and toe of all retaining wall elevations. <br /> <br />60. The record-grading plan is to be submitted to the Chief Building Official before the <br />first house final. <br /> <br />61. The soils engineer shall certify the pad compactions of all lots containing fill to the <br />satisfaction of the Chief Building Official prior to the issuance of building permits. <br /> <br />Construction Requirements: <br /> <br />62.AII site improvements and house construction activities shall be limited to the hours <br />of 8:00 a.m. to 5:00 p.m., Monday through Friday. The Planning Director may, on a <br />case-by-case basis, approve modified construction days and/or hours upon written <br />request by the project developer. All construction equipment must meet Department <br />of Motor Vehicles (DMV) noise standards and shall be equipped with muffling <br />devices. <br /> <br />63. At no time shall campers, trailers, motor homes, or any other vehicle be used as <br />living or sleeping quarters on the construction site. All such vehicles shall be <br /> <br />13 <br />