My WebLink
|
Help
|
About
|
Sign Out
SR 06:259
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2007 4:16:31 PM
Creation date
11/29/2006 3:00:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/5/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Carryover funding designated for the 800 MHz Radio Project, Veterans Memorial Building <br />furniture and fixtures, and the City-wide Tree Trimming Program will be moved into the <br />Replacement/Renovation Funds. These projects are described more fully later in this report in <br />the section on Replacement/Renovation Funds. <br /> <br />The grant revenue carryover includes the "Save Our Schools" grant that has not yet been <br />received but will be reimbursed by the PUSD. It also includes an Office of Traffic Safety (OTS) <br />grant that was received in the prior fiscal year but not yet expended. <br /> <br />ENTERPRISE FUNDS <br /> <br />The City currently has four Enterprise Funds, including the Storm Drain, Golf, Water and Sewer <br />Funds. Only the Operations & Maintenance (O&M), and Debt Service portions of these <br />enterprises are reflected in the Operating Budget. Capital Improvements and replacement for <br />Storm, Water and Sewer are accounted for in the CIP. FY 2006-07 is the first full year of <br />operation for the golf course. As a result, the annual golf budget is reflected in FY 2006-07 for <br />the first time. A small replacement fund for Golf has been created in the operating budget that <br />will provide for some equipment replacement and turf repairs beyond normal wear, if necessary. <br />The bigger issue of funding for longer-term renovations will need to be addressed in the future <br />as the income stream from the golf course and the replacement/renovation needs are better <br />known. Beginning in FY 2006-07, the City will include a fifth Enterprise Fund to account for <br />the Pleasanton Memorial Gardens cemetery. <br /> <br />WATER AND SEWER OPERATING FUNDS <br /> <br />Both the Water and Sewer Operating Funds ended FY 2005-06 with a higher ending fund <br />balance than was projected. However, an update in 2002 of the Sewer and Water Replacement <br />Program indicated that annual replacement accruals are starting to fall short of the projected <br />funding needs of the ongoing replacement program, in the short-term as well as in the longer <br />term. Dublin San Ramon Services District (DSRSD) is in the process of reviewing regional <br />sewer rates for FY 2006-07, and the City will be looking at local sewer rates also. The City <br />annually monitors water rates to compare with variables such as rising energy costs, the cost of <br />water purchased from Zone 7 and increasing capital replacement costs. Staff will conduct this <br />review again during FY 2006-07. <br /> <br />Both the Water and Sewer O&M Funds need a larger fund balance than many other Funds, <br />because of cash flow challenges (service is provided before revenue is received), and the need <br />for a larger than average contingency (due to weather changes and unexpected equipment <br />failures, costly water line breaks, etc.) Fund balances are monitored annually to determine if <br />they are adequate to meet unexpected situations. Excess balances can be used to make <br />additional transfers to the Water and Sewer Replacement Funds if needed to offset future costs. <br /> <br />SR 06:259 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.