Laserfiche WebLink
<br />Facilitation <br /> <br />On July 3, 2006, the Knights appealed the Commission's decision, thereby initiating the <br />facilitation process. The Commission's direction limited those who could be involved in the <br />facilitation to the appellants (Georgatos'), the applicants (Knights), the architect, a member in <br />support of the project, and the facilitator(s). <br /> <br />On September 21, 2006, a neighborhood facilitation meeting was held to determine if an <br />agreement could be reached. Present at the meeting were Mary Roberts, Facilitator; Jerry <br />Iserson, Director of Planning and Community Development; Stacey and Stan Knight <br />owners/applicants; Dennis and Barbara Georgatos, 790 East Angela; Martha Wensel, 787 <br />Mirador Court; and Peter Shutts, Architect. During the meeting, the Knights presented three <br />alternatives to the second-story design and discussed a reduction in the profile of the addition. <br />The neighbors presented their concerns and suggestions, and the following was agreed upon: <br /> <br />. The master bedroom would be moved 2 feet to the north, as proposed by the Knights. <br />. Transom windows would be used on the rear elevation in the master bedroom with a <br />minimum 6-foot windowsill. <br />. The stairway windows on the rear elevation will be glass block. <br />. There would be a 75 square-foot reduction in the second-floor. <br />. The Georgatos' will consider constructing a retaining wall on the rear shared property <br />line and filling the rear portion oftheir property; the cost of the new 6 foot fence on top <br />of the retaining wall would be split with the Knights. <br />. No Saturday construction. <br />. One additional tree in the rear yard of the Knights' property for the Georgatos'. <br />o Both will determine the species, size, and placement. <br /> <br />Detailed information on this meeting is provided in the attached facilitation meeting minutes in <br />Exhibit K. <br /> <br />SR 06:245 <br />Page 4 of8 <br />