My WebLink
|
Help
|
About
|
Sign Out
SR 06:242
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2006 2:05:17 PM
Creation date
10/12/2006 1:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/17/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:242
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Public Improvements and Traffic Mitigation <br /> <br />Traffic and Circulation <br /> <br />Eight dwclling units, generating a total of 80 trips during thc 24-hour day and 8 trips during thc <br />a,m./p,m. peak commute hour, is considered to be a less-then-significant addition of traffic to <br />thc surrounding street system, Thcrcforc, no traffic analysis was rcquircd for the proposal. Staff <br />notes that the project will actually gcncratc 70 ncw trips since onc unit is cxisting, <br /> <br />The project developcr will bc required to: <br /> <br />. Pay the City and Tri-Valley Traffic Impact Fees; <br />. Construct a lcft-turn lane/pocket from northbound Foothill Road to Old Foothill Road; <br />. Construct a right-turn deceleration lane from southbound Foothill Road to Old Foothill <br />Road; and, <br />. Rcconstruct the Foothill Road/Old Foothill Road intersection to a 900 alignment and <br />standard street interscction to improve circulation. <br /> <br />The location of thc dcvclopment's access from Old Foothill Road will bc coordinatcd with the <br />driveway opening to the Alviso Adobe Park, Thc central portion of Old Foothill Road will bc <br />closed, either with bollards or cul-de-sacs, so as to intcgrate the Alviso Adobe Park site with thc <br />proposed opcn space area and to prcvent through traffic on Old Foothill Road. <br /> <br />Construction Phasing <br /> <br />Thc proposed project will be constructed in two phascs, Phasc Onc will include the public in- <br />frastructure including construction of the strcet and cul-de-sac, mass grading for the lots, bio- <br />retention pond/swales, pcrimcter landscaping in the open space area, and the shared access <br />driveways. Phase Two will includc thc construction of custom homes individually lot-by-lot. <br /> <br />VI. DISCUSSION <br /> <br />Analysis <br /> <br />A complete discussion and analysis of the following IS contained in the attached Planning <br />Commission Staffrcport: <br /> <br />. General Plan, <br />. Zoning (A [Agriculture] District and West Foothill Road Corridor Overlay District), <br />. Site Design (Overall Site Plan, Open Space Arca, Wildland Firc Managcmcnt Plan, and <br />Residential Fire Sprinkler Systems), <br /> <br />SR 06:242 <br />Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.