My WebLink
|
Help
|
About
|
Sign Out
SR 06:152 (3)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:152 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 3:56:14 PM
Creation date
9/14/2006 3:55:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT A <br /> <br />SUMMARY OF VINEYARD AVENUE CORRIDOR SPECIFIC PLAN FUTURE <br />EXPENSES AND REVENUES <br />September 19. 2006 <br /> <br />ESTIMATED FUTURE SPECIFIC PLAN INFRASTRUCTURE EXPENSES <br /> <br />Water Infrastructure <br />Water Storage Tank (One Million Gallons) <br />Water Improvements, to Meet Non-Corridor Needs. <br />Water Tank Access Road <br />Pump Station <br />Zone 7 Turnout Improvements <br />Subtotal Water Infrastructure <br /> <br />Other Infrastructure Costs and Payments Due <br />Old Vineyard Trail <br />Vineyard Avenue Landscaping <br />Traffic Signal @ Pietronave Lane <br />Miscellaneous Construction Claims <br />Detention Pond Ramp <br />PG&E Protection Bollards <br />Reimbursements Due Developers <br />Outstanding Sewer Loan Payments Due City ( Existing Loan #1) <br />Outstanding Water Loan Payments Due City (Existing Loan #2).. <br />Project Contingencies and Revenue Uncertainties <br />Subtotal Other Improvements and Payments Due <br /> <br />$3,301,206 <br />$1,300,000 <br />$1,220,000 <br />$2,300,000 <br />$410.000 <br />$8,531,206 <br /> <br />Total All Infrastructure Improvements and Payments Due <br /> <br />$635,000 <br />$115,000 <br />$210,000 <br />$70,000 <br />$20,000 <br />$15,000 <br />$1,629,228 <br />$1,178,625 <br />$385,000 <br />$808,423 <br />$5,066,276 <br /> <br />$13,597,482 <br /> <br />PROJECTED REVENUE SOURCES <br />Current Balance of Vineyard Corridor Development Fees <br />Future Specific Plan Development Fees - New Development <br />Future Specific Plan Development Fees - Existing Homes <br />Reimbursements Due City <br />City CIP (011223) Contribution for Non Corridor Improvements... <br />Future Revenue from Water Rate Adjustment or Other Source .... <br />Total Projected Revenue <br /> <br />$2,658,988 <br />$4,250,000 <br />$630,000 <br />$4,758,494 <br />$645,000 <br />$655,000 <br />$13,597,482 <br /> <br />. Includes 400,000 gallon reservoir storage capacity and additional capacity to pump station and turnout. <br />- From CIP Water Proejct (01123) <br /> <br />- "As anticipated in CIP Waler Project (01123) <br /> <br />* - *Requires City Council Authorization and evaluation of other funding options. <br />
The URL can be used to link to this page
Your browser does not support the video tag.