My WebLink
|
Help
|
About
|
Sign Out
SR 06:152 (3)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:152 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 3:56:14 PM
Creation date
9/14/2006 3:55:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 6 <br />Memo to Mayor and City Councilmembers <br />September 19, 2006 <br /> <br />three outstanding loans related to Specific Plan infrastructure improvements; one for sewer and two for <br />water. <br /> <br />This draft Financing Plan makes assumptions related for future expenses and revenues that mayor may <br />not occur, and as a result, the actual financing and the ability to repay the loans will require additional <br />review as improvement are constructed and development occurs. While the City has the obligation to <br />repay any loan made from its CIP Water and Sewer Fund, it has the ability to determine the term of <br />repayment and the source of funds that will be used. As a result, upon completion of construction work, <br />staff can reassess this draft Financial Plan and recommend loan terms and identify revenue sources. In <br />other words, the pace of reimbursement can be spread out over many years and an assessment of non- <br />committed funds, including year end surpluses from the General Fund that has historically been <br />allocated to the CIP, can be revaluated as potential sources if Plan Areas fees are unavailable. <br /> <br />If the Council approves the information outlined in the draft Financing Plan, staff recommends approval <br />of the recommendation included in the attached August 15 staff report. <br /> <br />Attachment A - Draft Financing Plan (Financing Plan) <br />Attachment B - Vineyard Avenue Corridor Shared Infrastructure Financing Program (Financing Program) <br />
The URL can be used to link to this page
Your browser does not support the video tag.