Laserfiche WebLink
Stortr~water Construction Rec~ui ent <br />x36. The project development shall submit a. Sto rnzwater Pollution Prc ve ration Plan (S WPPP) <br />for review and approval by the City Engineer prior to issuance of building or grading <br />peniii ts. Dail are to co niply with the approved construction SWPPY nzay result n the <br />issuance of correctiox~ notices, citations or stop work order_ "i'he Following construction <br />L3 esi Man agenient Practices (B MPs), as well as any other applicable xneasurc, shall be <br />included in the SWPPP and implemented as approved by the City. <br />97. The project developer is responsible for in~xplexnenting the tollowing n-xcas ures during all <br />construction phases of the project- <br />a~ "1-he project developer shall include erosion control/storm water quality tizeasures <br />on the rna.l grading plan which shall specifically address n-xeasures to prevent soil, <br />dirt, and debris /.-roni entering tl7c storm drain system. Such mews arcs niay <br />includ e, but arc not lin~xited to, hydro seeding, lxay bales, sandbags, and siltation <br />fences and are subject to the review and approval of the City Engineer/Chief <br />Building Official. If no grading plan is required, necessary erosion control/storm <br />water quality measures shall be shown on the site plan suhniiited For an on-site <br />permit, subject to the review and approval of the Chiel-Building Oft3ci al. The <br />project developer is responsible for ensuring that the contractor is aware, of and <br />implements such trieasures. <br />b~ All cut axed -Fill slopes shall be rcvegetatcd axed stabilized agar completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to censure that the grasses are established before October 15. No grading <br />shall occur between October 1 5 and April 15 unless approved erosion <br />control/storm water quality rn eas ures are in place, subject to the approve] of City <br />Engineer/Chief Building Official. Such measures shall be n~ai ntained until such <br />time as perr-nanent landscaping is place. <br />c) Gather all construction debris on a. regular basis and place it in a dunzpstcr ox- <br />other container which is en~xptieci or renio veci on a. weekly basis. When <br />appro pria.tc, use tarps on the ground to collccit t-allexi debris or splatters that could <br />contribute to storm water runoff pollution. <br />d~ Remove all dirt, gravel, rubbish, rafiisc_ and green waste froxri the street pavem exit <br />and storm drains aclj Dining the site. Lixrxit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street paven~cni adjoining <br />the project site on a daily basis. Scrape caked-on mud and dirt from these areas <br />be 2>re sweeping. <br />14 <br />