Laserfiche WebLink
6Fi_ As rcq uircd by the lire Chief, all sprinkler and back flow prevention 1-'ire. l~cparttrient <br />connections <FDC~ shall be placarded with the ad dress(es~ it serves. The placard shall be <br />submitted with the signage package for the site and shall have num orals on a contrasting <br />baclcgro und_ All placards are subject to the review of the Firc Chict= <br />67. "Cho development shall meat all req uiren~ents of the Pleasanton Firc Coda ~Chaptcr 20.24 <br />of the Pleasanton Municipal Code)_ <br />NL7BLIC WORKS AND ENGINEERING <br />68. Prior to approval of the final neap, the applicant shall post with the City and additional <br />perfornzarace bond for all subdivision iniproverracnis that arc not accepted by the City of <br />Pleasanton. <br />6c~_ The perimeter of-all building foundations shall be designed with subdrains_ Said drains <br />shall be connected to the street gutter or other means acceptable to the City Engineer. <br />70. Roof leaders shall not be directly connected. into the storm drain system. <br />77 . The project developer shall install all new and exisiitig utilities (PGcYiI:, Pacific Bell. <br />Cable TV, ctc.~ underground for each parcel unless waived by the City Engineer. <br />72. LJnlcss otherwise approved by the City Engineer, all till and cut slopes shztill be <br />3 c 1 horizontal to vertical or Iess. <br />73. The project developer shall install street frontage improvements on the west side of Birch <br />Creel{ Drive par C_IZapter l 9.40.0 ] O of Lhe Pleasanton Municipal Codc and to the <br />satisfaction of the City Engineer. These improvcmcnts »~ay include, but arc not <br />necessarily lin~tited to, grading, curb and gutter, sidewalk, paving, storm. drain, sanitary <br />sewer, water facilities, street lighting, underground utilities, traffic control devices, <br />landscaping, and autotllatic irrigation systems. <br />74. The project developer shall submit a refundable cash bond for hazard ~u~ad erosion control <br />prior to issuance of an engineering or building peniiit_ "I'he amount of this bond will be <br />detcrn~ained by the City Engineer. <br />75. The haul route for all n~aaicri als to and fion~ ibis development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit- <br />76. 'fhc project developer shall submit a. dust control plan or procedure as part of the <br />improvement plans. <br />77_ The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Engineer. <br />10 <br />