Laserfiche WebLink
recycling service- If-con aectcd to tYxe sanitary sewer, a structural control such as a. <br />sand ti lter or oil/ water separator shall be used., and a sign shall be posted <br />prohibiting the dumping of hazardous materials. Uther methods may be used <br />subject to the approval of the Chief Building Of£ciaL The prof act developer shall <br />instruct employees to conduct all washing activities in this area- <br />L7rban Stormwater Construction Requirements <br />64. The project developer shall submit a Stonrtwater Pollution Prevention Plan (S WYYY) for <br />review and approval by the City Engineer prior to issuance of building or grading <br />permits. Failure to comply with the approved construction S WPPP nay result in the <br />issuance of correction notices, citations or stop work order. The following construction <br />E3est Maiiagetr~ent Practices ~BMYs~, as well as any other applicable tiieas ure, shall be <br />included in the SWPYY axed implemented as approved by the City. <br />65. "I'he project developer is responsible for implementing the following measures during all <br />construction phases of the project <br />a. The project developer shall include erosion control/storm water quality measures <br />on the final grading plaxi which shall specifiically address measures to prevent soil, <br />dirt, and debris fi-oni entering the storm drain system. Such measures n-tay <br />include, but are not limited to, hydroseeding, hay bales, sandbags, and siltation <br />fences and are suL~jcct to the review and approval of the City Engineer/Chief <br />Building Ufl-fetal- If no grading plan is required, necessary erosion control/storm <br />water quality measures shall be shown on the site plan submitted for an on-site <br />penrxit, subject to the review and approval of the C=hief Building Uffi cial. The <br />project developer is responsible for cn suring that the contractor is aware of and <br />implements such measures. <br />b_ Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is cniptied or removed on a weekly basis- When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution- <br />s. Remove all dirt, gravel, rubbish, refuse, and green waste li-om the street pavement <br />acid storn-x drains adjoining the site- I.ixi-xit construction access routes ox-~to the. site. <br />artd place gravel on them- Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather- Broom-sweep the street pavement adjoining <br />the project site on a daily basis. Scrape caked-on xnud aizd dirt from these areas <br />before sweeping. <br />d. Install filter materials (such as sandbags, filter fabric, etc. at the storm drain inlet <br />nearest the downstreaxri side ofi-the project site in order to retain airy debris or dirt <br />fi7owing in the storm drain systcni. Maintain and/or replace filter nzateri als to <br />ensure ai-[ectiveness and to prevent street tlooding_ <br />9 <br />