Laserfiche WebLink
<br />wet weather. Broom sweep the street pavement adjoining the project site on a daily <br />basis. Scrape caked-on mud and dirt from these areas before sweeping. <br /> <br />e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet nearest <br />the downstream side of the project site in order to retain any debris or dirt flowing in the <br />storm drain system. Maintain and/or replace filter materials to ensure effectiveness and <br />to prevent street flooding. <br /> <br />f) Create a contained and covered area on the sitc for the storage of bags, cement, paints, <br />oils, fertilizers, pesticides, or other materials used on the site that have the potential of <br />being discharged into the storm drain system through being windblown or in thc event of <br />a material spill. <br /> <br />g) Never clean machinery, equipment, tools, brushcs, or rinse containers into a street, gutter, <br />or storm drain. <br /> <br />h) Ensurc that concrete/gunite supply trucks or concrete/plaster operations do not discharge <br />wash water into street, gutters, or storm drains. <br /> <br />90. Stormwater Operation Requirements <br /> <br />a) Vegetated swales with grasses shall be mowed and clippings removed on a regular basis. <br /> <br />< END > <br /> <br />Page-16- <br />