<br />89. Stormwater Construction Requirements <br /> <br />Thc project development shall submit a Stormwater Pollution Prevention Plan (SWPP) for <br />review and approval by the City Engineer prior to issuance of building or grading permits. <br />Failure to comply with the approved construction SWPPP may result in the issuance of <br />correction notices, citations or stop work order. The following construction Best <br />Management Practices (BMPs), as well as any other applicable measure, shall be included in <br />the SWPPP and implemented as approved by the City. <br /> <br />The project developer is responsible for implementing the following measures during all <br />construction phascs of the project: <br /> <br />a) The project developer shall include erosion control/storm water quality measures on the <br />final grading plan which shall specifically address measures to prevent soil, dirt, and <br />debris from cntering the storm drain system. Such measures may include, but are not <br />limited to, hydroseeding, hay bales, sandbags, and siltation fences and are subject to the <br />review and approval of the City EngineerlDirector of Building Inspection. Ifno grading <br />plan is required, necessary erosion control/storm water quality measures shall be shown <br />on the site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The project devcloper is responsible for ensuring that <br />thc contractor is aware of and implements such measures. <br /> <br />b) All cut and fill slopes shall be revegetated and stabilized after completion of grading, but in <br />no case later than October 15. Hydroseeding shall be accomplished before September 15 <br />and irrigated with a temporary irrigation system to ensure that the grasses are established <br />before October 15. No grading shall occur between October 15 and April 15 unless <br />approved erosion control/storm water quality measures are in place, subject to the approval <br />of City EngineerlDirector of Building Inspection. Such measures shall be maintained until <br />such time as permanent landscaping is place. <br /> <br />c) Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, usc tarps <br />on the ground to collect fallen debris or splatters that could contribute to storm water <br />runoff pollution. <br /> <br />d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement and <br />storm drains adjoining the site. Limit construction access routes onto the site and place <br />gravel on them. Do not drive vehicles and equipment off paved or graveled areas during <br /> <br />Page -15- <br />