Laserfiche WebLink
<br />Subdivision" prepared by Berlogar Geotechnical Consultants and any <br />supplemental peer review and response letters. The applicant shall address the <br />peer review comments to the satisfaction of the City Engineer prior to tentative <br />map approval. The project developer's geotechnical consultant shall review and <br />approve all foundation, retaining wall, and drainage geotechnical aspects of the <br />final development plans to ensure that the recommendations have been properly <br />incorporated into the development. The consultant shall certifY by writing on the <br />plans or as otherwise acceptable to the Chief Building Official that the final <br />development plan is in conformance with the geotechnical report approved with <br />the project. <br /> <br />67. The project developer shall arrange and pay for the geotechnical consultant to <br />inspect and approve all foundation, retaining, and wall and drainage geotechnical <br />aspects of project construction. The consultant shall be present on site during <br />grading and excavation operations. The results of the inspections and the as-built <br />conditions ofthe project shall be certified in writing by the geotechnical consultant <br />for conformance to the approved plans and geotechnical report and submitted to <br />the City Engineer and Chief Building Official for review and approval prior to <br />occupancy. <br /> <br />68. The project developer shall submit a refundable cash bond for hazard and erosion <br />control prior to issuance of an Engineering or Building Department permit. The <br />amount of this bond will be determined by the City Engineer. <br /> <br />69. The project developer/subdivider shall deposit a bond with the City of Pleasant on <br />to ensure completion of any required improvements. This bond shall be in a <br />standard form approved by the City Attorney and shall be in an amount <br />satisfactory to the City Engineer. The City Engineer may waive this requirement <br />if the required improvements have been satisfactorily installed/constructed prior to <br />recordation of the final parcel map. <br /> <br />70. The project developer shall grant an easement to the City over those parcels <br />needed for public service easements (P.S.E.) and which are approved by the City <br />Engineer or other easements, which may be designated by the City Engineer. <br /> <br />71. The project developer's contractor(s) shall obtain an encroachment permit from the <br />City Engineer prior to moving any construction equipment onto the site. <br /> <br />72. The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of an encroachment permit. <br /> <br />73. The project developer shall include erosion control measures on the final grading <br />plan, subject to the approval of the City Engineer. The project developer is <br />