My WebLink
|
Help
|
About
|
Sign Out
SR 06:198
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2006 11:59:00 AM
Creation date
8/10/2006 11:40:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/15/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />originally contemplated. Also, after the repairs were completed, most of these welds were re- <br />inspected for a second time. Consequently, it is necessary that the contract with S & C be <br />amended to make available additional inspection hours to provide the same level of <br />examination through the completion of the work. Staff is recommending that the contract with <br />S & C be amended to provide for the extra inspection hours to assure conformance with the <br />approved plans and specifications. <br /> <br />Consultant amendment <br /> <br />S & C Engineering has proposed a scope of work, to finish the inspection services, which <br />includes a fee estimate. The basis for compensation will be on a time and materials basis. This <br />amendment adds an additional $18,500.00 to the contract, bringing the new not-to-exceed <br />amount to $95,670.00. <br /> <br />Reimbursement for Consultant Fees <br /> <br />The conditions of approval and the Pre-annexation Development Agreement for the Bernal <br />Project require BIC to construct the Valley Avenue Railroad Undercrossing. Under terms of <br />a reimbursement agreement for inspection services, BIC will reimburse the City for the cost of <br />specialty inspection as part of BIC's obligation to construct the Valley Avenue Railroad <br />Undercrossing. <br /> <br />FISCAL IMPACT <br /> <br />Once completed and accepted by the City, it is estimated that there will be an increase of <br />$10,500.00 per year in operating costs, due to increased maintenance of the subject roadway <br />improvements including landscaping and storm drainage pump station. <br /> <br />RECOMMENDATIONS <br /> <br />1. Approve the attached professional services contract amendment with S & C <br />Engineering to provide for an additional $18,500.00 in services. <br /> <br />2. Approve the attached Amended Reimbursement Agreement with Bernal Investment <br />Company (BIC) to reimburse the City for the cost of the amended S & C <br />Engineering contract. <br /> <br />SR:06: 198 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.