My WebLink
|
Help
|
About
|
Sign Out
RES 91023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1991
>
RES 91023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 3:53:56 PM
Creation date
7/27/1999 8:41:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/19/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· City of Pleasanton <br /> S TA FF REP 0 R T A <br /> Planning Department <br /> Februar~ 19, 1991 <br /> <br /> SUBJECT: Foothill Road Alignment Stud~ - Stoneridge Drive to <br /> Bernal Avenue <br /> <br /> PURPOSE= To adopt alignment and cross-sections for Foothill Road. <br /> PLANNING COMMISSION RECOMMENDATION= <br /> <br /> Adopt a two-lane roadway, with bike lanes and turn lanes, <br /> while reserving right-of-way for the four-lane General <br /> Plan section. <br /> <br /> STAFF RECOMMENDATION = <br /> <br /> Adopt a resolution setting forth: <br /> <br /> (a) the alignment and cross-sections as shown on the <br /> attached cross-section exhibit and alignment plan <br /> as follows: <br /> <br /> - (1) Stoneridge Drive to Muirwood Drive South: <br /> right-of-way - General Plan Option four- <br /> lane alignment/section <br /> cross-section - Interim Option A (three-lanes, <br /> permanent median location) <br /> <br /> (2) Muirwood Drive South to Highland Oaks Drive: <br /> right-of-wa~ - General Plan Option four- <br /> lane alignment/section <br /> cross-section - transition from Interim <br /> Option A (three-lanes) to interim two- <br /> lanes (no median) at Kliment property, <br /> then transition back to Interim Option A <br /> (three-lanes) <br /> <br /> (3) Highland Oaks Drive to Muirwood Drive South: <br /> right-of-way - General Plan Option four- <br /> lane alignment/section (includes <br /> transition to one southbound lane between <br /> Foothill High School and Muirwood Drive <br /> South) <br /> cross-section - Interim Option A (three- <br /> lanes), modified to accommodate bus <br /> parking at Foothill High School <br /> <br /> SR91:52 I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.