My WebLink
|
Help
|
About
|
Sign Out
SR 06:151
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2006 11:12:42 AM
Creation date
7/14/2006 11:09:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:151
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BUDGET <br /> <br />The Council recently approved the Mid-Term Capital Improvement Program, which includes <br />$427,872 in additional funding for the project. With that action, total funding to date is <br />$3,987,017. Of this amount, $496,630 has been spent, or is encumbered, resulting in a project <br />funding balance of $3,490,387. Assuming a 5% project contingency, the available funding is <br />$524,759 less than required to complete the project. A project budget detailing this information <br />is included as Attachment A. <br /> <br />As indicated, staff spent considerable time refining the project specifications to minimize project <br />costs. In addition, staff is not recommending inclusion of the add/alternates. To further reduce <br />costs so that they are consistent with available funding, the project scope could be modified by <br />eliminating installation of the new HV AC system ($350,000), kitchen upgrades ($75,000), and <br />wood restoration ($110,000). These changes would reduce construction costs by a total of <br />$535,000 and eliminate the funding shortfall. Because the addition of an HV AC system (the <br />building does not currently have air conditioning and has only limited heating), kitchen upgrades, <br />and repair of damaged wood molding are fundamental elements of the project, staff is not <br />recommending these modifications. It should be noted that because staff has had an opportunity <br />to fully review project specifications with the contractor, the project contingency has been <br />reduced from the standard 10% to approximately 5% for a savings of $200,000. However, as <br />with all historical renovation projects, the potential for unforeseen modifications remains a <br />possibility. Nevertheless, staff intends to fully monitor project change orders to minimize use of <br />the contingency. <br /> <br />FISCAL IMPACT <br /> <br />The project budget is detailed in Attachment A. As indicated, staff is recommending a $300,000 <br />transfer from the Facilities Replacement Fund and a $224,759 transfer from the Capital <br />Improvement Program Reserve (CIPR) to address project costs. With the transfer, the reserve <br />will have a FY2006/07 balance of $1,337,925. Any remaining project contingency will be <br />placed in the CIPR. <br /> <br />As the Council was informed previously, staff has been working with our local federal <br />legislators in an attempt to secure supplemental grant funding for the Alviso Adobe Community <br />Park, Vineyard Avenue improvements and the Veterans building. If approved, funding for the <br />Veteran's building may be approximately $450,000. The Senate is expected to consider its <br />version of the Transportation-HUD funding bill- which includes the Vineyard Corridor and the <br />Veterans building - sometime later this month. It's unclear when, and if, the Senate will be <br />including earmarks at that time or if it will wait until Conference with the House to include this <br />funding. In any event, a decision is expected late this Fall. If this funding is received, it will be <br />appropriated to the CIPR. <br /> <br />SR06:151 <br />Page 4 <br />