Laserfiche WebLink
<br />Moller Ranch <br /> <br />The Engineer's Report for the Moller Ranch GHAD provides that funding is needed for the <br />following: excavation and re-compaction of shallow slope failures, installation of additional <br />subdrain systems, repair of surface drainage improvements, construction of additional surface <br />drainage improvements, restoration of eroded areas and/or removal of siltation deposits, site <br />inspection, preparation of the Engineer's Report and City administrative costs. This year, the <br />parcel assessment has been increased 2.3 percent for inflation from $89 to $91, including the <br />City-owned water reservoir within the District. With 100 properties within the District, <br />including the City-owned water reservoir site, this year's budget will be $9,100. Currently, <br />the Moller Ranch GHAD has a fund balance of $57,087 for the repair and maintenance of <br />hillside slopes and drainage facilities, as may be necessary in the future. <br /> <br />Laurel Creek Estates <br /> <br />The Engineer's Report for the Laurel Creek Estates GHAD provides that funding is needed <br />for the following: repair and maintenance of surface and subsurface drainage facilities, slope <br />stabilization, . erosion control, routine maintenance, site inspection, preparation of the <br />Engineer's Report and City administrative costs. This year, the parcel assessment has been <br />increased 2.3 percent for inflation from $307 to $314, including the two City-owned water <br />reservoirs within the District. There are 121 properties within the District (102 Laurel Creek <br />Estates, including the two City-owned water reservoirs, the 7 annexed with Oak Hill Estates <br />and the 12 properties annexed as the Kolb Ranch Estates). This year's budget will be $37,994. <br />Currently, the Laurel Creek Estates GHAD has a fund balance of $350,242. At the time of <br />initiation of this District, each homeowner was required to fund the GHAD in the amount of <br />$1,000 per lot at the time of close of escrow. This condition was also imposed upon the Oak <br />Hill Estates and Kolb Ranch Estates lots at the time they were annexed into the existing <br />GHAD. The budget for this district assumes the potential for a significant repair of the hillside <br />slopes once every ten years. <br /> <br />Lemoine Ranch Estates <br /> <br />The Engineer's Report for the Lemoine Ranch Estates GHAD provides that funding is needed <br />for the following: inspection, repair of the surface drainage improvements such as the concrete <br />v-ditches and storm drain outlets including detection and mitigation of potential geologic <br />hazards, slope stabilization, erosion control, routine maintenance, site inspection, preparation <br />of the Engineer's Report and City administrative costs. This will be the third year of <br />assessments for Lemoine Ranch Estates GHAD. The parcel assessment has been increased <br />2.3 percent for inflation from $511 to $523. There are no City-owned parcels within this <br />GHAD. With 12 properties within the District, this year's budget will be $6,276. The <br />Lemoine Ranch Estates GHAD will have a fund balance of $23,591. (The developer was <br /> <br />SR:06: 189 <br />Page 7 of37 <br />