Laserfiche WebLink
<br />McCloud Tank Rehabilitation (Engineering studies) FY 2005-06 <br />Project No. 051023 <br />Total <br /> <br />$ 75,000 <br />$ 75,000 <br /> <br />Expected Expenditures for recommended two consultant engineering contracts <br /> <br />Engineering Studies <br />Contingency <br /> <br />Total <br /> <br />$ 51,754 <br />$ 5,000 <br />$ 56,754 <br /> <br />FISCAL IMPACT <br /> <br />These consulting contracts, with a not-to-exceed amount of $21,954.00 and $29,800.00, will <br />result in an independent study of the tank to determine whether replacement or rehabilitation is <br />warranted. At the present time, no funds have been set aside for tank replacement. If safety <br />issues are uncovered, the tank may be taken out of service until funds for replacement are <br />accrued. There will be only minor additional operation and maintenance work associated with <br />this work by the City's Utility Operations crews to assist the consultants and any sub- <br />consultants with the evaluations planned for the tank. <br /> <br />Respectfully Submitted, <br /> <br />-----' <br />7(l0..e- <br /> <br />r) ,,-(\\f)\ n <br />~~~ <br />David P. Culver <br />Director of Finance <br /> <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />Nelson Fialho <br />City Manager <br /> <br />Attachments: Contracts (2) <br /> <br />SR 06:163 <br />Page 4 of 4 <br />