My WebLink
|
Help
|
About
|
Sign Out
SR 06:163
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:43:33 PM
Creation date
7/13/2006 3:36:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />3. Meetings with City Staff: <br /> <br />a. TJCAA envisage the need to participate in two meetings with City staff. a) <br />Discussions on the preliminary design and b) discussions on the final design <br />and more specifically retrofit options (if needed). <br /> <br />b. Deliverables - None <br /> <br />c. Cost - $1,710 <br /> <br />Assumptions <br /> <br />1. For the purposes of developing the proposed scope of work and structural <br />engineering fee estimate, the following elements have been assumed to require <br />structural engineering. <br /> <br />a. Evaluation of existing McCloud Water Storage Tank <br />b. Development of retrofit options as required. <br /> <br />2. Geotechnical services associated with the design of the proposed project are not <br />included in the scope of services outlined above. <br /> <br />3. Written documents will be provided in MS-Word 2000 format. <br /> <br />4. Services during construction (retrofit) are not included in the scope of services <br />outlined above. <br /> <br />Hourlv Breakdown - DesiQn: <br /> Principal Senior Engineer Admin <br /> EnQineer <br /> Hours $151{hr. Hours $134{hr. Hours $67{hr. <br />Task 1 Prelimarv Report 8 $1,208 24 $3 216 8 $536 <br />Task 2a Fu II Report 16 $2 416 30 $4,020 16 $1,072 <br />Task 2b Retrofit Options 16 $2 416 40 $5 360 0 $0 <br />Task 3 Meetinqs 6 $906 6 $804 0 $0 <br />Totals 46 I $6 946 I 100 I $13400 24 $1,608 <br /> Grand Tota11S21,954 <br />
The URL can be used to link to this page
Your browser does not support the video tag.