My WebLink
|
Help
|
About
|
Sign Out
SR 06:163
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:43:33 PM
Creation date
7/13/2006 3:36:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />f..-y. h, bil A <br /> <br />~ <br /> <br />TJC & Associates, Incorporated <br /> <br />SCOPE OF WORK <br /> <br />City of Pleasanton <br />McCloud Tank Rehabilitation <br />Pleasanton, California <br /> <br />TJC & Associates, Inc. (TJCAA) estimates the structural engineer fee at $21,954. The fee <br />quoted is based on the structural engineering services associated with the tasks outlined <br />below: <br /> <br />1. Structural Engineering Analyses (Preliminary Design): <br /> <br />o. TJCAA will evaluate the McCloud Water Storage Tank against current code <br />mandated Design Basis Earthquake (DBE). Specifically, design will be <br />primarily based on the requirements of the 2001 California Building Code <br />(CBe), AWWA DllO - Standard for Wire- and Strand-Wound, Circular, <br />Prestressed Concrete Water Tanks, ACI 350 - Seismic Design of Liquid <br />Containing Concrete. Geotechnical concerns regarding the soil parameters will <br />be based on recommendations from the project geotechnical engineer. <br />Seismic design parameters will follow the recommendations from the 2001 <br />CBC with input from both the project geotechnical engineer and published <br />information from the USGS regarding anticipated site-specific ground motions. <br /> <br />b. Deliverables - Preliminary Report and meeting with City staff to discuss <br />findings. <br /> <br />c. Cost - $4,960 <br /> <br />2. Structural Engineering Analysis (Final Report): <br /> <br />o. Based on the preliminary design performed under Task 1 above, and <br />discussions with City staff. TJCAA will perform a complete analysis of the <br />McCloud Wate Storage Tank. Included within this report will be specific tank <br />vulnerabilites and areas of concern. <br /> <br />As part of this task TJCAA will facilitate the inspection and assessment of the <br />tank's condition and provide an opinion of the source of the leakage currently <br />being experienced by the tank. <br /> <br />b. Included within this report will be a list of retrofit options available. This list <br />will include options to repair the leak. If required, options to bring the tank up <br />to code. <br /> <br />c. Deliverables - Final Report and meeting with City staff to discuss findings. <br /> <br />d. Cost - a) $7,508 and b) $7,776 <br />
The URL can be used to link to this page
Your browser does not support the video tag.