Laserfiche WebLink
SUMMARY OF MAJOR FUNDED PROJECTS <br />This yeaz's program contains $21,914,486 of funded FY 1999/00 projects and $21,215,112 in 2000/01 <br />projects. A summary of the major projects includes: <br />STREETS <br />~ FY 1999/00 <br />• Provide $1,062,110 for various street resurfacing projects (page 7). <br />• Widening of Stanley Boulevazd at ValleyBernal for $325,000 (page 17). <br />• Construction of a second bridge at Bernal Avenue and Arroyo del Valle for $1,407,533 (partially <br />funded in FY 2000/Ol (page 9). <br />• Santa Rita Road resurfacing from Old Santa Rita to Stoneridge at a total cost of $593,000 (page <br />16). <br />• Hopyazd Road resurfacing from Coronado to Valley at a cost of $858,000 (page 14}. <br />~ FY 2000/O1 <br />• The annual resurfacing of various City streets at a cost of $1.2 million (page 7). <br />• I-580 corridor signal interconnect for a cost of $3 million (page 28). <br />• The widening of Foothill Road at Dublin Canyon Road at a cost of $998,000 (page 27). <br />• Providing $923,310 for the widening of Santa Rita Road and Valley Avenue (page 30). <br />• $696,000 to reconstruct Second Street from Kottinger to Neal (page 31). <br />PARKS <br />s FY 1999/00 <br />The completion of the Alviso Adobe Community Park. As projected in the CIP, revenue to <br />construct this pazk will be available by the end of yeaz 2001/02. Total estimated cost of pazk <br />development is $1,190,640 (page 42). <br />Improve the lighting at softball complex in sports pazk for $380,000 (page 44). <br />Prepare a Master Plan for Amador Valley Community Pazk at a cost of $50,000 (page 43). <br />xvii <br />