Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan EI R <br /> <br />Table 3 <br />Summary ofEIR Alternatives <br /> <br />Uses: <br />ACE train station <br />^ ^ ~~~m.^~_.~_. <br />Agriculture club <br />Agriculture (crops only) <br />Child cared <br />Cultivated stream (partially incl, in BCp) <br />Cultural arts facilities <br />Elementary school (now existing) <br />Environmental Education Center <br />habitat <br />Fire station <br />Native American area <br />Open spacee (incl. wetlands and KnoJ~ <br /> <br /> <br />Project Alt.l Alt, 2 <br />Fi ure 6 Fi ure 7 Fi ure 8 <br />Sub-area' Sub-area Sub-area <br />not incl. not incl. 2 <br /> 7 7 <br /> 7 <br /> S c <br />1 <br />1 <br />8 8 <br />13 13 13 <br />1 1 1 <br />4 4 4 <br />14 14 14 <br />2,3,6,10,11, 2,3,6,10,11, 2,3,6,10,11, c <br />lS,16 12, 13! 15,!6 12,13, !S, 16 <br /> 2 2 2 <br />12 2 not <br />as needed as as as needed <br />in all sub-areas in all <br />9 9 <br />2 2 2 <br /> <br /> <br />Scenario: <br /> <br /> <br /> <br /> <br />Park ~an(r rec'reationf <br /> <br /> <br />Public utilitiesandimprovernents <br />Trails <br />Water treatment <br />Youth/community center <br /> <br />a In the project, no provision for the ACE Train Station is made on the site, and the Specific Plan does not call <br />for enhancement of the access between the site and the station. In Alternative', the ACE Train Station <br />remains in its current offsite location, but the plan calls for enhancement of pedestrian access between the <br />Bernal Property and the station, as well as shared use of the parking at the Cultural Arts Center. In <br />Alternative 2, the ACE Train Station would be on the site in sub-area 2. <br />b See Table 1 (p. 9) for the list of potentially permitted uses in each sub-area and Appendix B for more <br />extensive descriptions of each use. <br />c These uses are theoretically possible in a number of sub-areas because the Phase I site plan was not <br />prescriptive with respect to uses or locations for Phase II: decisions were to be made during the Phase II <br />planning process. <br />d Sub-area 5 was initially targeted for child care because of its proximity to Central Area residential use, but <br />child care could also be provided in sub-area 6 under the project and Alternative 1. <br />e See Figure 5, Illustrative Site Plan, for the type of open space use(s) associated with each sub-area. Open <br />spaces would also be provided in sub-areas 2, 11, 12, 13,14,15, and 16, in conjunction with other uses. <br />f Individual parks provided for in Phase I include the Village Commons as part of the Central Area residential <br />development and the neighborhood park that is part of the Western Area residential development. <br />g As shown in Figure 5-4, Major Trails and Bikeways Diagram, Preliminary Draft Specific Plan (October 25, <br />2005), <br /> <br /> <br />Chapter 5 provides a discussion of the environmental impacts of the project alternatives, <br /> <br />30 <br />