My WebLink
|
Help
|
About
|
Sign Out
SR 06:120
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2006 12:40:42 PM
Creation date
6/2/2006 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/6/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />pLEASANTONo <br /> <br />Invitation to Bid on <br />"As Needed Services" <br />For the City of Pleasanton <br />Bid No. OSC-06-01-UT <br /> <br />Introduction <br /> <br />The City of Pleasanton is located in Alameda County, approximately 35 miles southeast <br />of San Francisco and sited at the intersection of Interstate 580 and Interstate 680. Total <br />area within the City boundary is approximately 22 square miles. City population exceeds <br />66,190. Pleasanton's water system has 277 miles of water mains with 20,519 service <br />connections. The sewer system has 231 miles of sewer mains; the City also has over 100 <br />buildings, 91 miles of roads, and over 450 acres oflandscaped parks, facility, and street <br />median areas. <br /> <br />The City of Pleasanton is aligning its "As Needed Services" contracts with the Fiscal <br />Year and is requesting experienced licensed contractors to perform routine and <br />emergency as needed services and repairs, for a twenty four (24) month period starting <br />Jul~ I, 2006 with a not to exceed maximum of $75,000 per fiscal year (July 1st thru June <br />30' ), in the following areas: <br /> <br />Facilities Repairs <br />Painting <br />Roofing <br />HVAC <br />Electrical (General) <br />Flooring <br />General Construction <br />Pest Control <br />Glass <br />Door/Gate Maintenance <br /> <br />Utilities <br />Sewer System Repairs <br />Water main repairs <br />Storm Drain System Repairs <br />Polybutylene Services <br />Process Control Electrical <br />Water Pump Repairs <br />Sewer and Storm Pump Repairs <br />Fence Installation and Repair <br /> <br />**Parce/ maps available upon request <br /> <br />Park Landscape <br />Concrete (Sidewalk) <br />Irrigation installation <br />and repair <br />Plant installation <br />General landscape <br />construction/renovation <br /> <br />GENERAL CONTRACT PROVISIONS FOR ALL AREAS <br /> <br />. Contractor must provide and maintain in full force for the duration of the contract <br />General Liability and Bodily Injury Insurance, Automobile Insurance, Worker's <br />
The URL can be used to link to this page
Your browser does not support the video tag.