My WebLink
|
Help
|
About
|
Sign Out
SR 06:120
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2006 12:40:42 PM
Creation date
6/2/2006 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/6/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Invitation to Bid on "As Needed Services" <br /> <br />. Removal and replacement of sidewalk per square foot, to include root cutting or <br />grinding, if necessary. <br /> <br />. Resetting of brick paving stones per sq. ft, per City specifications. <br /> <br />Parks - Landscape Services (lrril!ation. plantinl! and General Construction) <br /> <br />The City is requesting an experienced and licensed, (C-27 required) contractor to perform <br />routine landscape construction and renovation work in the City Park and street median <br />areas on an as-needed basis. All work is to be performed to current City Standards and <br />Specifications dated June 2002. Requested unit price quotes are to include the composite <br />price for labor and equipment, including all incidental power tools, hand tools, and <br />vehicles, as well as overhead costs. Rates are to be on-site productive time only and are <br />to include any clean up and disposal costs due to work. <br /> <br />OUTLINE OF BID <br /> <br />Submitted bid shall contain the following: <br />Section I <br /> <br />. Cover letter <br />. Description of scope of services to be furnished <br />. Project approach including ability to meet any deadlines for responding to a <br />request for work. <br />. Deliverables to be submitted to the City upon completion of each job. <br /> <br />Section II <br /> <br />Percent of mark-up on material including overhead and profit: <br /> <br />Percent of mark-up on outside equipment: <br />approved by the City). <br /> <br />(equipment pre- <br /> <br />The City will not pay travel time, so any Contractor desiring to cover those costs will <br />need to incorporate them in the applicable hourly rates. <br /> <br />. Contractor rate schedule including overhead and profit, as described below: <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.