My WebLink
|
Help
|
About
|
Sign Out
SR 06:160
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2006 12:42:52 PM
Creation date
6/2/2006 10:55:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/6/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />subside this surruner, staff will work with Zone 7 to construct permanent channel bank repairs. <br />S-6 is a critical facility in the sanitary sewer collection system. Its preservation and good <br />operation are necessary to deliver millions of gallons of effluent daily to the Dublin San Ramon <br />Services District (DSRSD) Treatment Plant. <br /> <br />Based on damage information, Governor Schwarzenegger has sent a letter requesting a <br />Presidential declaration of disaster. Once a disaster is declared, a request for public assistance <br />can be submitted. The request for public assistance must include Pleasanton's "Authorized <br />Agent" to be accepted. Staff recommends we designate an "Authorized Agent" for this <br />possible declaration or in preparation of future declarations. <br /> <br />FISCAL IMPACT <br /> <br />There is no fiscal impact from the requested action; however, there is a potential to receive <br />public assistance and reduce costs to the sewer utilities and ultimately the ratepayers. <br /> <br />The cost incurred to-date for the emergency stabilization work is approximately $16,000. This <br />includes after -hours staff efforts and work performed by the City's emergency contractor, <br />McGuire and Hester. Staff estimates the cost of the remaining work to be approximately <br />$45,000. <br /> <br />Respectfully Submitted, <br /> <br />12{:0L- <br /> <br />~k~-:~ <br /> <br />David P. Culver <br />Director of Finance <br /> <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />Nelson Fialho <br />City Manager <br /> <br />Attachment: Resolution <br /> <br />SR 06:160 <br />Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.