My WebLink
|
Help
|
About
|
Sign Out
SR 06:144
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:26 AM
Creation date
5/12/2006 11:26:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:144
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r <br /> <br />'" <br /> <br /> <br />68 <br /> <br />'- <br /> <br />./ <br /> <br />City Council <br />Staff Report <br /> <br />May 16, 2006 <br />Public Works Department <br /> <br />SUBJECT: <br /> <br />REVIEW OF BIDS AND AWARD OF CONTRACT FOR <br />KOTTINGER CREEK RESTORATION PROJECT, CIP NO. 038023 <br /> <br />STAFF RECOMMENDATION: <br /> <br />Staff recommends that the City Council take the following action at the <br />meeting of May 16, 2006: <br /> <br />1. Review the bids received and award a contract for the subject <br />project to Hanford Applied Restoration & Conservation of <br />Sonoma, California, for a low base bid of $847,256.24. <br /> <br />2. Consider bid alternatives and direct staff accordingly. <br /> <br />3. Authorize the City Manager to enter into the above contract. <br /> <br />SUMMARY: <br /> <br />Bids have been received for the subject project and staff is recommending <br />award of a construction contract to the low bidder in the amount of <br />$847,256.24. The project consists of restoring Kottinger Creek to a more <br />natural setting, including the removal of invasive species, regrading of the <br />creek, the replacement of the existing irrigation system and the <br />revegetation of the creek with native plantings, trees and shrubs. <br /> <br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />At the meeting of March 21, 2006 the City Council approved the plans and specifications and <br />authorized the calling for bids for the subject project. Sealed bids for this project were opened <br />on May 3rd, 2006. A total of three bids, which ranged from $847,256.24 to $1,137,239.00 <br />were received. The consultant engineer's estimate for the 'base" project without alternative <br /> <br />SR 06:144 <br />Page 1 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.