My WebLink
|
Help
|
About
|
Sign Out
SR 06:114
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:30:18 AM
Creation date
5/12/2006 11:14:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit H I STATEMENT OF WORK <br /> <br />New World Deliverables: <br />New World will provide the following deliverables: <br /> <br />a) Training sessions for table, file and validation sets set up. <br />b) Provide checklist of potential problems with Master Files that need correction prior to going live <br />on MSP applications. <br />c) Provide documentation. <br /> <br />Customer Responsibilities: <br />Customer will: <br /> <br />a) Provide necessary personnel to complete Master File Configuration set up within expected time <br />frame. <br />b) Provide reasonable training facilities and the required equipment to conduct education classes of <br />up to 10 students (unless agreed to otherwise). <br />c) Provide progress report 10 New World Project Manager. <br /> <br />Customer Deliverables: <br />Customer will provide the following deliverables: <br /> <br />a) Completed Master Files <br /> <br />3.6 Interface Installation <br /> <br />Obiective: <br />To install working interfaces. <br /> <br />New World Responsibilities: <br />New World will: <br /> <br />a) Install interfaces. <br />b) Test and verify interfaces <br /> <br />New World Deliverables: <br />New World will provide the following deliverables: <br /> <br />a) Interfaces thai funclion as per the contract. <br /> <br />Customer Responsibilities: <br />Customer will: <br /> <br />a) E911 interface: Provide vendor contact information and data file structure to New World. <br />(I) Provide connection from E9l1 equipment to CAD sever. <br />b) StateINCIC interface: Provide State CLETS contact information. <br />(I) Provide NClC/CLETS formatting requirement for returns. <br />c) On-line CAD Interface: Advise with formatting return information, screen building. <br />d) Assist with installing interfaces where appropriate. <br />e) Connection from E911 syslem to CAD Server. <br /> <br />Agreement 041006 final.doc <br /> <br />CONFIDENTIAL <br />Page 40 of 57 <br /> <br />City of Pleasanton, CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.