Laserfiche WebLink
<br />· Minor landscape plantings and irrigation (rudimentary shrub and vine plantings only). <br />· Necessary site work and utilities supply (water, sanitary sewer, and electrical service). <br /> <br />Add Alternate Bid Items. In order to allow the Council flexibility when awarding the project, <br />and to attempt to keep the project within the recommended cost of $290,000, staff directed the <br />design consultant to structure the bid proposal with a number of "Add Alternate" items that <br />could be awarded should the budget allow. These alternate items would generally enhance the <br />appearance and maintainability of the finished project. The "Add Alternate" items and staff <br />recommendation regarding including these upgrades in the overall project are as follows: <br /> <br />ADD ALTERNATES AND STAFF RECOMMENDATIONS <br /> <br /> SUMMARY Cost STAFF RECOMMENDATION <br />Al - Provide wood slats and wood $9,000 This work is an integral component of <br />trellis near the door outside the the facility design. Staff recommends <br />women's restroom acceptance of this item. <br />A2 - Provide wood beam and $5,700 This work is an integral component of <br />screen toward W. Angela Street, the facility design. Staff recommends <br />along the building's axis. acceptance of this item. <br />A3 - Provide three (3) wooden $2,778 These benches will benefit the public <br />benches outside the restroom waiting at the restrooms. Staff <br />building. recommends acceptance of these items. <br />A4 - Provide electrically operated $9,769 This is a nonessential amenity. Staff <br />automatic flush valves and faucets can retrofit at a later date if needed. <br />for all fixtures, including related <br />wiring and conduit (in lieu of <br />manually operated fixtures). <br />AS - Provide enhanced site paving, $6,060 This is a nonessential amenity. Staff <br />landscape planting, and irrigation. can retrofit at a later date if necessary. <br />A6 - Provide decorative site $13,774 This is a nonessential amenity. Staff <br />lighting - up-lights to illuminate can retrofit at a later date if necessary. <br />building and existing trees. <br />A 7 - Provide low fence on the west $2,025 This is a nonessential amenity. Staff <br />side of the facility, along the open can retrofit at a later date if necessary. <br />channel. <br /> <br />In order to eliminate the possibility of "bid shopping," California Public Contract Code requires <br />that the alternate bid items be awarded in the order listed. For instance, should the Council wish <br />to include the electrically operatedflush valve item (A4), it must also award the wood slats, <br />wood beam and wooden benches items (AI through A3). As a result, the add alternates are <br />included in the bid on a priority order. Staff has reviewed the necessity and costs related to <br />these items and determined that only the first three (3) should be completed at this time. If <br /> <br />SR 06:086 <br />Page 3 <br />