My WebLink
|
Help
|
About
|
Sign Out
SR 06:142
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:17 AM
Creation date
5/12/2006 10:39:44 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mitilmted Plans <br /> <br />The Phase II Specific Plan, Community Park Master Plan, and EIR were prepared <br />concurrently by City staff and consultants. This process provided the opportunity for the <br />environmental consultants to recommend mitigations for otherwise potentially significant <br />environmental impacts that could then be incorporated directly into the Plans. The result <br />is what is called "mitigated plans," or plans that contain the environmental mitigations <br />within their text. This approach has allowed for a more interactive exchange of <br />information between the staff who organized the plan documents and the consultants who <br />evaluated the environmental consequences of the plans. <br /> <br />Public Review Process <br /> <br />The City prepared and circulated a notice of preparation (Nap) for an environmental <br />impact report (EIR) on August 29, 2005. The Nap provided a brief description of the <br />proposed Plans and a brief summary of potential environmental impacts. The Nap was <br />distributed to agencies, the general public, and other concerned individuals, and provided <br />a 3D-day period for interested parties to submit comments regarding environmental <br />matters to be addressed in the EIR. <br /> <br />On September 7,2005, the City convened a public scoping meeting to address the <br />potential impacts on the environment. Comments were received through the combined <br />NOP and public scoping process. <br /> <br />Based partially on the Nap and public scoping process, the City prepared a Draft EIR <br />(DEIR) that was published on February I, 2006. The CEQA-mandated 45-day public <br />review period began on February 6,2006, and ended on March 23,2006. In addition to <br />the comments received at a public hearing conducted by the City Planning Commission <br />on February 22, 2006, comment letters were submitted by various public agencies and <br />organizations. <br /> <br />Responses to all comments received were prepared and included in the Final EIR, which <br />was prepared in accordance with CEQA and the guidelines for implementation ofCEQA. <br /> <br />FINDINGS FOR ALTERNATIVES EVALUATED IN THE EIR <br /> <br />During the preparation ofthe EIR for the proposed Project, the City evaluated several <br />alternatives. A description and a finding for each alternative are presented below. <br /> <br />Alternative 1 <br /> <br />Description <br /> <br />This alternative is similar to the Project in situating two major uses in the same locations <br />as the Project: the cultural arts center in the northeast corner of the site and the Altamont <br /> <br />Bernal Property Phase II Specific Plan and Bernal Community Park Master Plan <br />Environmental Impact Report Findings and Statement of Overriding Considerations <br /> <br />Page 4 of23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.