Laserfiche WebLink
<br />. Ability to work with other solar service providers and include using other <br />solar service providers in ultimate design of the program if that would best <br />serve the community <br /> <br />Ability to vet contractors and installers of photo voltaic systems <br /> <br />. Ability to design an innovate, user friendly, economical community-wide <br />solar buying program that would have the ability to respond to the <br />changing trends in both the manufacture of solar panels, the regulations <br />applying to solar installations, and the financial incentives for the purchase <br />of solar systems. <br /> <br />2. MINIMUM QUALIFICATIONS OF CONSULTANT: <br /> <br />The consultant shall possess experience with designing a community-wide solar <br />buying program in a City or jurisdiction. Required experience shall include <br />experience implementing a community-wide solar buying program in a City or <br />jurisdiction. The program should have been in place for a minimum of one year. <br /> <br />3. INSURANCE REQUIREMENTS: <br /> <br />The firm or individual selected to perform the work will be required to provide, <br />with the contract, insurance, and indemnification in the amount shown in <br />Appendix A. <br /> <br />C. A DESCRIPTION OF THE LIVERMORE COMMUNITY <br /> <br />The City of Livermore was incorporated in 1876. It lies in Alameda California with a <br />population of approximately 81,000. The City Council oversees the operation of the <br />City, which occupies 24 square miles. Livermore is located 42 miles southeast of San <br />Francisco and 30 miles southeast of Oakland. <br /> <br />Livermore contains 42 parks, 2 municipal and 2 private golf courses, 3 libraries, 5 fire <br />stations, I wastewater treatment facility, and I municipal airport. For 2004, <br />Livermore's total bundled usage for 2004 was 500,492 megawatt-hours and <br />Livermore's total direct access usage for 2004 was 40,109 megawatt-hours. <br /> <br />D. THE STATEMENT OF OUALIFICATIONS: <br /> <br />1. FORMAT AND REQUIREMENTS: <br /> <br />Statements of Qualifications shall be 8-1/2" by II", with the pages numbered <br />sequentially. I" margins shall be provided on all pages. Statements shall be in a <br />12-point (or larger) font and may be single or double-spaced. <br /> <br />Request for Qualifications <br />Community-wide Photovoltaic Purchasing Program Design <br />Page 3 of4 <br />