Laserfiche WebLink
· Retaining Walls <br /> <br /> - Concrete See Basic Fee Schedule (page 7), with <br /> the valuation based on the contract <br /> price or $15.00 per linear foot, <br /> whichever is greater. <br /> <br /> - Wood See Basic Fee Schedule (page 7), with <br /> the valuation based on the contract <br /> price, or $10.00 per linear foot, <br /> whichever is greater. <br /> · Demolitions See Basic Fee Schedule (page 7) <br /> · Fencing (greater than six See Basic Fee Schedule (page 7) <br /> foot height) <br /> · Foundation Only <br /> (includes plan check) <br /> <br /> - Residential See Basic Fee Schedule (page 7) <br /> <br /> - Commercial <br /> Existing See Basic Fee Schedule (page 7) <br /> NeW 10% of building permit <br /> · Fire Sprinkler Permit See Basic Fee Schedule (page 7) <br /> (Includes Plan Check) <br /> · On Site Permit (Plan See Basic Fee Schedule (page 7) <br /> Check) <br /> · Unmetered ConsWuction $25 <br /> Water for Each Single <br /> Family Unit <br /> · Roof'mg Permits See Basic Fee Schedule (page 7) <br /> · Peer Review of Soils Fee paid by Developer for cost of <br /> Report third party peer review <br /> · Solar Heating Units See Basic Fee Schedule (page 7) <br /> Permits <br /> · Termite Permits See Basic Fee Schedule (page 7) <br /> Surcharge 25 % of building permit fee on all <br /> permits for residential occupancies <br /> applied after 7/1/92 <br /> <br />building.fcc4/16/93 Page 12 <br /> <br /> <br />