Laserfiche WebLink
, See Project 2b <br /> to Isabel and remove Portola ramps.~ description <br /> Stage 2: Construct 6 lane overpass <br /> <br /> easan e and ultimate interchange. ~ L..,,,/, <br /> <br /> Stage 1: Construct 2 lane <br /> roadway and grade separation <br /> at Stanley. (Measure B) <br /> <br /> Stage 2: Construct 4/6 lane <br /> xpressway. Segment <br /> <br /> Stage 1: Developer construct 2 lane <br /> roadway. <br /> <br /> Stage 2: Construct 4/6 lane expressway. <br /> <br /> Segment ~ <br /> Stage 1: Construct uphill truck lanes; <br /> improve deficient curves. <br /> <br /> Stage 2: Construct 4 lane expressway. <br /> <br /> Note:Segment (~ is TVTDF Project 2B <br /> Segments ®, ® and ® are TVTDF Proiect 2A r'~ <br /> II <br /> North <br />LEGEND Not to Scale <br /> <br />me Project Location <br />TVTC Expenditure Plan Figure <br />State Route 84 Corridor Improvements 1-580 to 1-680 <br /> 2a <br /> <br />S9-2~- 1/99- LH <br /> <br /> <br />