Laserfiche WebLink
60. All utilities required to serve any the proposed developWent on-site shall be installed un- <br /> derground. <br /> <br /> 61. The applicant shall submit a refundable cash bond for hazard and erosion control prior to <br /> issuance of an Engineering or Building Department permit. The amount of this bond will <br /> be determined by the City Engineer. <br /> <br /> 62. The developer shall grant an easement to the City over those areas of the site needed for <br /> public service easements (P.S.E.) which are approved by the City Engineer, or other ease- <br /> ments which may be designated by the City Engineer. <br /> <br /> 63. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of an encroachment permit. <br /> <br /> 64. The applicant shall include erosion control measures on the final grading plan, subject to <br /> the approval of the City Engineer. The applicant is responsible for ensuring that the con- <br /> tractor is aware of such measures. All cut and fill slopes shall be revegetated and stabi- <br /> lized as soon as possible after completion of grading, in no case later than October 15. <br /> No grading shall occur between October 15 and April 15 unless approved erosion control <br /> · measures are in place, subject to the approval of the Building Department. Such meas- <br /> ures shall be maintained until such time as permanent landscaping is in place. <br /> <br /> 65. The developer shall submit a dust control plan or procedure as part of the improvement <br /> plans. <br /> <br /> 66. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a dedi- <br /> cated public street or public service easement approved by the City Engineer shall be pri- <br /> vately maintained by the property owners or through an association approved by the City. <br /> <br /> 67. The design of the water supply and sanitary sewer systems shall be subject to the review <br /> and approval of the City Engineer. <br /> <br /> 68. Approval of the storm drainage system shall be subject to the review and approval of the <br /> City Engineer and Zone 7, as applicable, that the system is adequate, connects to an ap- <br /> proved point of discharge, meets any and all applicable requirements of the Alameda <br />' County Flood Control District - Zone 7, meets any and all applicable requirements of the <br /> Federal Emergency Management Flood Hazard Program, the California Department of <br /> Fish and Game, and meets the immediate and long-range requirements of this develop- <br /> ment and all upstream areas intended to be drained through this development. <br /> <br /> 69. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br /> <br /> SR:96.'269 September 3, 1996 <br /> Case PUD-80-16-13D Page 10 <br /> <br /> <br />