My WebLink
|
Help
|
About
|
Sign Out
RES 96102
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1996
>
RES 96102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 8:36:54 AM
Creation date
2/24/1999 7:02:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/3/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51. The soils engineer shall certify the pad compaction of ag_y portion of the project site con- <br /> taining fill to the satisfaction of the Director of Building Inspection prior to the issuance <br /> of building permits. <br /> <br />52. A sanitary sewer sampling manhole shall be provided on the sanitary sewer lateral from <br /> each building, unless otherwise waived by the Director of Building Inspection. Sampling <br /> manholes shall be located on each sewer line as necessary to isolate each building includ- <br /> ing Bank of America. <br /> <br />53. All retaining walls higher than four feet (4' 0") from the top of the wall to the bottom of <br /> the footway shall be constructed of reinforced concrete or shall be an approved crib wall <br /> type. Calculations signed by a registered civil engineer shall accompany the wall plans. <br /> <br />Construction Requirements: <br /> <br />54. The developer shall complete all of the on-site improvements at one time. <br /> <br />55. Final inspection by the Planning Department of the building and site covered by this de- <br /> velopment plan approval is required prior to occupancy. <br /> <br />56. All site improvements and building construction activities shall be limited to the hours of <br /> 8:00 a.m. to 5:00 p.m., Monday through Saturday. Construction within the fully enclosed <br /> building shell may occur at any time of the day or night. Between the hours of 5:00 p.m. <br /> to 8:00 a.m., construction traffic shall use Hopyard Drive to Owens or Morse Drives to <br /> Johnson Drive to access the site. All construction equipment must meet California De- <br /> partment of Motor Vehicle noise standards and shall be equipped with muffling devices. <br /> <br /> 57. At no time shall campers, trailers, motor homes, or any other vehicle be used as living or <br /> sleeping quarters on the construction site. All such vehicles shall be removed from the <br /> site at the end of each work day. <br /> <br />58. To prevent odor, portable toilets used during construction shall be emptied on a regular <br /> basis to prevent odor. <br /> <br /> Engineering Requirements: <br /> <br /> 59. The developer shall submit a final grading and drainage plan prepared by a licensed civil <br /> engineer depicting all final grades and on-site drainage control measures. This plan shall <br /> be subject to the review and approval of the City Engineer and/or the Director of Building <br /> Inspection prior to the issuance of any building permits. <br /> <br /> SR:96:269 September 3, 1996 <br /> Case PUD-80-16-13D Page 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.